I would like to use -forvalues- to run loops over the years 84-02. It
works fine from 84-99 but in 2000 I get problems. I have tried to run
the loop 00-02 separately to avoid the "2k flip". The thing is, however
that –foreach- and forvalues- writes 00 as 0 and 01 as 1.
Any suggestions on this?
Hans
--
Hans J. Baumgartner
Deutsches Institut für Wirtschaftsforschung (DIW Berlin)
German Institute for Economic Research
Abt. Staat / Dept. Public Economics
Königin-Luise-Str. 5; 14195 Berlin (Dahlem)
Tel.: 030/89789-307; Fax.: 030/89789-114 http://www.diw.de